About Us Fleet Equipment Track
Record

Latest
Salvage

Performance
Record
Press Contact Us Brochures

KASEL’S TRACK RECORD
Kasel has chalked up an impressive track record in a whole range of salvage jobs around the world.

MACHINERY PRESERVATION HIGHLIGHTS

• Haris


When: June 2000
Where: Indonesia

Project:
The engine room of this 26,000 dwt bulker, loaded with a cargo of expeller, was flooded.
Contract: Subcontracted .

Details:
Water from the flooded engine room was pumped out. Machinery preservation was also carried out with the use of chemicals. She was then delivered to an anchorage in Singapore.

 



 
• Alondra Rainbow


When: November 1999
Where: India

Project:
This 8,000 dwt cargo vessel had been hijacked by pirates.
Contract: Lump sum for machinery preservation and daily rate for standby services.

Details:
Kasel Salvage was responsible for machinery preservation and provided other standby services until the vessel arrived at the shipyard in Singapore.

 
   

•••••
©2006 Copyright of Kasel Salvage Pte Ltd, Singapore